Well renovation machine
- Concept design
- Structural analysis / verification
- Calculation and design of boom cross sections
- Detailed design
- Prototype assembly
- Software programming
- Training on the job for operators
- Dokumentation
- Acceptance / verification / testing
- Construction site support
Long truck
Obtaining the operating licence in accordance with §21 StVZO (§19(2) StVZO)
- Construction and conversion in accordance with legal requirements
- Accompanying advice for TÜV approval
Car as a kit
- Concept development
- Structural analysis / verification
- Detailed design
- Design support