Well renovation machine

  • Concept design
  • Structural analysis / verification
  • Calculation and design of boom cross sections
  • Detailed design
  • Prototype assembly
  • Software programming
  • Training on the job for operators
  • Dokumentation
  • Acceptance / verification / testing
  • Construction site support

 

 

 

 

 

 

 

 

Long truck

Obtaining the operating licence in accordance with §21 StVZO (§19(2) StVZO)

  • Construction and conversion in accordance with legal requirements
  • Accompanying advice for TÜV approval

 

 

 

 

Car as a kit

  • Concept development
  • Structural analysis / verification
  • Detailed design
  • Design support